Skip to main content

GRACE: Evidence-Bound Grid Curtailment Admission, Observation, and Single-Use Settlement
draft-schrock-kintzele-grid-curtailment-00

Document Type Active Internet-Draft (individual)
Authors Iman Schrock , Justin D. Kintzele
Last updated 2026-08-21
RFC stream (None)
Intended RFC status (None)
Formats
Stream Stream state (No stream defined)
Consensus boilerplate Unknown
RFC Editor Note (None)
IESG IESG state I-D Exists
Telechat date (None)
Responsible AD (None)
Send notices to (None)
draft-schrock-kintzele-grid-curtailment-00
Network Working Group                                         I. Schrock
Internet-Draft                                     EMILIA Protocol, Inc.
Intended status: Informational                             J. D Kintzele
Expires: 22 February 2027                               J Diesel NY, LLC
                                                          21 August 2026

   GRACE: Evidence-Bound Grid Curtailment Admission, Observation, and
                         Single-Use Settlement
               draft-schrock-kintzele-grid-curtailment-00

Abstract

   This document defines GRACE, an application profile for one bounded
   grid.curtailment action.  The profile binds an exact action to a
   finite participation envelope, distinct human approvals when
   required, one-attempt executor admission, an authenticated actuator
   acknowledgment, separately authenticated meter observations, an
   Action State Signed Statement, and one-time admission to a settlement
   effect.  Missing or ambiguous post-invocation evidence is preserved
   as indeterminate and cannot authorize blind retry.

   GRACE verifies signed inputs and deterministic computations.  It does
   not establish physical meter truth, baseline correctness, tariff
   eligibility, actual payment, complete mediation, or a physical grid
   deployment.  An optional hybrid artifact-signature profile combines
   Ed25519 with ML-DSA-65 and requires both signatures to verify.

Status of This Memo

   This Internet-Draft is submitted in full conformance with the
   provisions of BCP 78 and BCP 79.

   Internet-Drafts are working documents of the Internet Engineering
   Task Force (IETF).  Note that other groups may also distribute
   working documents as Internet-Drafts.  The list of current Internet-
   Drafts is at https://datatracker.ietf.org/drafts/current/.

   Internet-Drafts are draft documents valid for a maximum of six months
   and may be updated, replaced, or obsoleted by other documents at any
   time.  It is inappropriate to use Internet-Drafts as reference
   material or to cite them other than as "work in progress."

   This Internet-Draft will expire on 22 February 2027.

Schrock & Kintzele      Expires 22 February 2027                [Page 1]
Internet-Draft              GRACE Curtailment                August 2026

Copyright Notice

   Copyright (c) 2026 IETF Trust and the persons identified as the
   document authors.  All rights reserved.

   This document is subject to BCP 78 and the IETF Trust's Legal
   Provisions Relating to IETF Documents (https://trustee.ietf.org/
   license-info) in effect on the date of publication of this document.
   Please review these documents carefully, as they describe your rights
   and restrictions with respect to this document.  Code Components
   extracted from this document must include Revised BSD License text as
   described in Section 4.e of the Trust Legal Provisions and are
   provided without warranty as described in the Revised BSD License.

Table of Contents

   1.  Introduction  . . . . . . . . . . . . . . . . . . . . . . . .   2
     1.1.  Requirements Language . . . . . . . . . . . . . . . . . .   3
   2.  Terminology and Roles . . . . . . . . . . . . . . . . . . . .   3
   3.  Trust and Deployment Inputs . . . . . . . . . . . . . . . . .   4
   4.  Curtailment Action  . . . . . . . . . . . . . . . . . . . . .   4
   5.  Participation Envelope and Containment  . . . . . . . . . . .   5
   6.  Human Authorization . . . . . . . . . . . . . . . . . . . . .   5
   7.  Executor Admission and Refusal Semantics  . . . . . . . . . .   5
   8.  Dispatch Acknowledgment . . . . . . . . . . . . . . . . . . .   6
   9.  Meter Statement and Compliance Computation  . . . . . . . . .   7
   10. Outcome Binding . . . . . . . . . . . . . . . . . . . . . . .   7
   11. Action State Signed Statement . . . . . . . . . . . . . . . .   8
   12. Single-Use Settlement Admission . . . . . . . . . . . . . . .   8
   13. Proof-of-Curtailment Bundle . . . . . . . . . . . . . . . . .   8
   14. Artifact Signature Profiles . . . . . . . . . . . . . . . . .   9
   15. Privacy Considerations  . . . . . . . . . . . . . . . . . . .   9
   16. Security Considerations . . . . . . . . . . . . . . . . . . .   9
   17. Implementation Status . . . . . . . . . . . . . . . . . . . .  10
   18. IANA Considerations . . . . . . . . . . . . . . . . . . . . .  10
   19. Normative References  . . . . . . . . . . . . . . . . . . . .  10
   20. Informative References  . . . . . . . . . . . . . . . . . . .  12
   Authors' Addresses  . . . . . . . . . . . . . . . . . . . . . . .  12

1.  Introduction

   A curtailment instruction can cross several administrative and
   technical boundaries before it changes electrical load.
   Authentication of the dispatcher alone does not answer whether the
   exact event fit a customer-approved participation envelope, whether
   the required people approved it, whether the executor admitted it
   only once, or whether later measurement refers to the same action.

Schrock & Kintzele      Expires 22 February 2027                [Page 2]
Internet-Draft              GRACE Curtailment                August 2026

   GRACE keeps those questions separate.  It defines an exact action, a
   bounded envelope, pre-dispatch authorization and admission checks,
   separately authenticated execution and measurement claims, outcome
   reconciliation, and single-use settlement admission.  Each relying
   party selects and pins its own issuers, keys, policies, adapters,
   clocks, and state stores.

   The profile does not define a demand-response tariff, a baseline
   methodology, a physical meter, a scheduler, or a payment rail.  Those
   systems remain authoritative for their own claims.  GRACE binds their
   signed inputs to one action and records the result of deterministic
   verification.

1.1.  Requirements Language

   The key words "MUST", "MUST NOT", "REQUIRED", "SHALL", "SHALL NOT",
   "SHOULD", "SHOULD NOT", "RECOMMENDED", "NOT RECOMMENDED", "MAY", and
   "OPTIONAL" in this document are to be interpreted as described in BCP
   14 [RFC2119] [RFC8174] when, and only when, they appear in all
   capitals, as shown here.

   BCP 14 is indexed by the RFC Editor at [BCP14].

2.  Terminology and Roles

   Participation Envelope  A customer-approved, finite set of power,
      energy, count, duration, notice, and time-window bounds.  The
      current profile identifier is EP-FLEX-ENVELOPE-v2.

   Curtailment Action  The closed EP-GRACE-CURTAILMENT-ACTION-v1 object
      that identifies one requested power-reduction event.

   Admission  The executor-side decision that the exact action may enter
      effect custody once.  Admission is not evidence that the effect
      occurred.

   Actuator  The deployment-pinned adapter that attempts the physical or
      scheduler operation and signs an acknowledgment.

   Meter  A separately pinned observation source.  A meter statement is
      a signed source claim, not proof of physical truth or calibration.

   Settlement Effect  A deployment-supplied downstream operation invoked
      only after the required evidence reconciles.  GRACE controls at-
      most-one invocation attempt for one entitlement key.  It does not
      define or prove payment.

Schrock & Kintzele      Expires 22 February 2027                [Page 3]
Internet-Draft              GRACE Curtailment                August 2026

3.  Trust and Deployment Inputs

   A conforming deployment MUST independently configure the accepted
   action and envelope versions, approver roster and threshold, WebAuthn
   relying-party identifier and origins, actuator and meter keys, source
   roles and control-domain identifiers, validity and freshness policy,
   Action State signing key, execution store, settlement store, and
   settlement adapter.  Presenter-supplied trust anchors or policy
   values MUST NOT influence acceptance.

   Every protected effect path for which a deployment claims GRACE
   enforcement MUST pass through the same admission boundary.  An
   implementation that can be bypassed may still emit evidence, but it
   MUST NOT claim complete enforcement.

4.  Curtailment Action

   The action MUST be a closed JSON object [RFC8259] that can be
   serialized with JCS [RFC8785].  Unknown, duplicated, missing, or non-
   canonicalizable members are a refusal.  Its required members are:

   {
     "@version": "EP-GRACE-CURTAILMENT-ACTION-v1",
     "action_id": "grace:event:...",
     "action_type": "grid.curtailment",
     "effect_class": "power_reduction",
     "facility": "facility:...",
     "target_delta_kw": "18000",
     "window": {
       "not_before": "2026-07-15T20:15:00.000Z",
       "not_after": "2026-07-15T21:45:00.000Z"
     },
     "issued_at": "2026-07-15T20:00:00.000Z",
     "expires_at": "2026-07-15T21:45:00.000Z",
     "baseline_method_hash": "sha256:...",
     "control_mode": "human_on_the_loop",
     "envelope_id": "grace:envelope:...",
     "requested_by": "ep:agent:grid-coordinator"
   }

   target_delta_kw MUST be a positive decimal string with at most three
   fractional digits.  Timestamps MUST be UTC RFC 3339 timestamps with
   millisecond precision.  issued_at MUST precede window.not_before.
   expires_at MUST equal window.not_after.  control_mode is either
   human_on_the_loop or human_in_the_loop.  The baseline-method digest
   commits to the program-selected method; it does not validate that
   method.

Schrock & Kintzele      Expires 22 February 2027                [Page 4]
Internet-Draft              GRACE Curtailment                August 2026

   The verifier MUST derive the action digest and CAID [EP-CAID] from
   the exact controlled-action projection.  A supplied identifier MUST
   NOT replace that derivation.

5.  Participation Envelope and Containment

   The action names one EP-FLEX-ENVELOPE-v2 envelope.  The relying party
   MUST obtain that envelope from its pinned authority and MUST verify
   that it applies to the facility, program, and evaluation time.  The
   bounds object contains positive max_event_mw, max_period_mwh,
   max_events, max_event_hours, min_notice_minutes, and a participation
   window.

   Before dispatch, the executor MUST compare power with power, energy
   with energy, count with count, and duration with duration.  The
   action's MW cannot exceed max_event_mw.  Its MW multiplied by window
   duration cannot exceed the remaining period MWh budget.  One more
   event and its duration must fit the remaining event and event-hour
   budgets.  Its notice and window must fit the envelope.

   A required bound or present spent-accounting value that is missing,
   negative, or unparseable is a refusal.  An omitted spent value
   asserts zero prior settled usage; deployments that cannot make that
   assertion MUST return indeterminate rather than use zero.

6.  Human Authorization

   The relying party selects an ordered approver roster and a threshold
   using the action-bound authorization evidence in [EP-RECEIPTS].  Each
   accepted approval MUST be a Class-A WebAuthn [WEBAUTHN] signoff over
   a context that binds the controlled action digest, presentation
   digest, policy digest, initiator, approver, roster index, threshold,
   validity window, relying-party profile, app, platform, credential,
   and device key.

   The verifier MUST require user verification, the pinned relying-party
   identifier and origin, distinct approvers, distinct device and
   credential identifiers, initiator exclusion, the exact roster index,
   and the selected threshold.  The quorum semantics are those of
   [EP-QUORUM].  A valid signature that does not match the relying
   party's current roster, policy, action, presentation, or ceremony
   window is a refusal.

7.  Executor Admission and Refusal Semantics

   The executor applies the Action Evidence Boundary [EP-AEB] in this
   order:

Schrock & Kintzele      Expires 22 February 2027                [Page 5]
Internet-Draft              GRACE Curtailment                August 2026

   1.  Validate the closed action and require it to be active.

   2.  Derive and verify action-to-envelope containment.

   3.  Derive the expected outcome policy and require its digest to be
       inside the human-approved policy bytes.

   4.  Verify the human authorization against the pinned profile.

   5.  Require the pinned actuator, meter, Action State signer,
       execution store, settlement store, and settlement adapter.

   6.  Atomically reserve the exact execution idempotency key before
       invoking the actuator.

   The execution idempotency key MUST bind the action identifier and
   action digest.  The shared store MUST be durable, atomic, and
   ownership-fenced.  Concurrent reservation failure is refuse_replay.
   Storage unavailability is a refusal before invocation.

   If invocation begins and the result is lost, malformed, or raises an
   exception, the executor MUST return execution_indeterminate, preserve
   or burn the reservation, set retry_safe to false, and MUST NOT
   blindly invoke the effect again.  Authenticated reconciliation is
   required.

   Pre-invocation failures use a mechanism-named refusal such as
   refuse_action, refuse_action_not_active, refuse_outside_envelope,
   refuse_outcome_policy, refuse_authorization, or
   refuse_adapter_unavailable.  Post-invocation evidence failures use
   effect_unconfirmed and are not retry authorization.

8.  Dispatch Acknowledgment

   The dispatch request binds the complete action, action digest,
   envelope digest, human-authorization digest, idempotency key, and
   operator.  The actuator acknowledgment MUST bind the event
   identifier, action digest, dispatch-request digest, idempotency key,
   actuator identity, status, and dispatch time, and MUST verify under
   the pinned actuator key.

   An accepted acknowledgment is the actuator's authenticated claim that
   it dispatched the request.  It is not independent measurement and
   does not establish that electrical load changed.

Schrock & Kintzele      Expires 22 February 2027                [Page 6]
Internet-Draft              GRACE Curtailment                August 2026

9.  Meter Statement and Compliance Computation

   The meter statement MUST bind the meter identifier, event identifier,
   action digest, exact action window, unit, baseline MW, ordered
   sequence of timestamped load intervals, measurement class,
   observation time, and signer key identifier.  It MUST verify under a
   separately pinned meter key.

   The meter statement MUST NOT contain baseline_method_hash.  Program
   and tariff rules remain in the authorized action and relying-party
   policy.  This separates a signed measurement-source claim from the
   rule used to interpret it.

   The reference computation subtracts average interval load from the
   signed baseline MW, divides the delivered MW by ordered MW, and marks
   the event compliant at a profile-selected threshold.  A deployment
   MUST pin the computation and threshold it uses.  The result states
   what follows from the accepted inputs.  It does not prove the
   baseline was economically correct, the readings were physically true,
   or the event qualifies under a tariff.

10.  Outcome Binding

   The action's human-approved policy binds source-routed predictions
   for an executor observation and an independent-observer meter
   observation.  Each Outcome Observation [EP-OUTCOME] MUST bind the
   authorization record, action digest, CAID, consumption nonce,
   operation identifier, facility, observation window, source role,
   source class, and observed effect.

   The relying party MUST pin source keys, roles, classes, control
   domains, status and validity, distinctness requirements, observation
   windows, and maximum attestation delay.  A declared control domain is
   relying-party policy input, not proof of organizational independence.

   Settlement admission requires a reconciled outcome with the profile-
   selected in-bounds result.  Missing, stale, invalid, wrong-window,
   same-domain, or otherwise insufficient observations produce
   effect_unconfirmed.  They MUST NOT be converted to success, failure,
   or retry authorization.

Schrock & Kintzele      Expires 22 February 2027                [Page 7]
Internet-Draft              GRACE Curtailment                August 2026

11.  Action State Signed Statement

   After outcome reconciliation, the profile emits a COSE_Sign1
   [RFC9052] Action State Signed Statement using [ACTION-STATE] format
   version 2 and media type application/agent-action-capsule+json.  The
   statement binds the action, operator, developer, authorization
   digest, dispatch-request digest, meter digest, constraints evaluated,
   disposition, and confirmed effect.

   The capsule identifier is derived from canonical capsule bytes.  The
   JSON wrapper, COSE payload, protected headers, key identifier, and
   statement digest MUST cross-check.  The current reference output is
   an unregistered_signed_statement.  It is not a SCITT transparency-
   service registration or proof of ledger inclusion.

12.  Single-Use Settlement Admission

   The one-time entitlement key is the injective serialization of
   [envelope_id, event_id, meter_payload_digest] under profile EP-GRACE-
   SETTLE-v1.  Every member is required.  The meter digest MUST be a
   lowercase SHA-256 digest of the accepted signed meter body.

   Only a compliant computation and an in-bounds reconciled outcome may
   reach the settlement adapter.  The settlement store MUST reserve the
   entitlement atomically before invocation.  A duplicate is
   settlement_already_consumed.  If invocation begins and its result is
   unknown, the implementation MUST commit or preserve the reservation
   and MUST NOT issue another settlement attempt under the same
   entitlement.

   This is at-most-one admission to the configured settlement effect in
   one authoritative state domain.  It is not exactly-once physical
   payment, global double-spend prevention across independent
   authorities, tariff eligibility, or evidence that funds moved.

13.  Proof-of-Curtailment Bundle

   The EP-GRACE-PROOF-OF-CURTAILMENT-v1 bundle is a signed, offline-
   verifiable summary.  It binds the action and action digest, envelope
   digest, baseline-method digest, authorization digest, dispatch-
   request digest, actuator-acknowledgment digest, meter-payload digest,
   Outcome Binding result digest and outcome, deterministic compliance
   result, Action State statement digest, and settlement admission
   result.

   Bundle verification establishes integrity and binding relative to the
   verifier's pinned trust and policy inputs.  It does not independently
   establish any source claim as real-world truth.

Schrock & Kintzele      Expires 22 February 2027                [Page 8]
Internet-Draft              GRACE Curtailment                August 2026

14.  Artifact Signature Profiles

   The baseline profile signs canonical artifact bytes with Ed25519.
   The optional EP-GRACE-ARTIFACT-SIGNATURE-v2 profile uses a fixed
   required algorithm list, in order: Ed25519 and ML-DSA-65 [FIPS204].
   Its signing bytes commit to the complete artifact and the required
   algorithm list.

   A v2 verifier MUST require exactly one signature under each
   independently pinned key and MUST accept only when both signatures
   verify.  Missing algorithms, reordered or narrowed requirements, key
   substitution, malformed signatures, or an unavailable ML-DSA verifier
   are refusals.  A v1 verifier MUST NOT silently accept a v2 artifact.

   Hybrid signing provides cryptographic migration evidence.  It does
   not make a software-held key hardware-backed, FIPS validated,
   deployed, or operationally independent.  A deployment claiming the
   hybrid profile MUST identify and protect both actual signing keys.

15.  Privacy Considerations

   Curtailment records can reveal facility identity, capacity, operating
   schedules, energy consumption, human approvers, device identifiers,
   and commercial program terms.  Implementations SHOULD minimize
   portable fields, disclose raw intervals only to parties that require
   them, use digests when independent recomputation is not required, and
   apply retention and access policies appropriate to critical-
   infrastructure data.

   Selective disclosure or encryption cannot repair an overbroad signed
   source object.  Deployments SHOULD separate public verification
   material from restricted operational evidence and preserve enough
   binding information to detect substitution.

16.  Security Considerations

   The principal attacks are action substitution, envelope overflow,
   stale approval, initiator self-approval, duplicate approvers,
   dispatch replay, lost acknowledgment, actuator-key substitution,
   meter-key substitution, market-rule smuggling into meter data,
   observation-source collapse, wrapper substitution, signature-leg
   stripping, and duplicate settlement admission.  The preceding
   sections require fail-closed checks for each.

Schrock & Kintzele      Expires 22 February 2027                [Page 9]
Internet-Draft              GRACE Curtailment                August 2026

   Key compromise remains a trust-root failure.  Historical signatures
   can establish what a key signed; they do not prove who controlled the
   key or that the signed claim was true.  A separately keyed meter
   under the same operator's control may improve fault isolation but
   does not create organizational independence.

   GRACE cannot prove that the selected baseline is fair, a meter is
   calibrated or untampered, a scheduler has no bypass, a declared
   control domain is honest, a payment rail moved funds, or an
   authority's upstream population is complete.  Deployment claims MUST
   state those acceptance roots.

17.  Implementation Status

   This section records implementation evidence and may be removed
   before publication as an RFC.

   The public EMILIA repository [GRACE-IMPLEMENTATION] contains a
   TypeScript reference circuit for exact action construction, two
   distinct Class-A approvals, bounded admission, a COSA-labeled
   simulated actuator, a separately keyed simulated meter, Outcome
   Binding, an Action State Signed Statement, and one-time settlement
   admission.  The adapters are marked simulation: true.  The circuit is
   not evidence of a physical grid event, production COSA integration,
   utility adoption, meter truth, or an actual payment.

   At the repository revision identified in the companion validation
   record, 80 targeted tests pass across four files.  They cover the
   curtailment and mobile-grid state machines, production route
   boundary, and an 11-case Ed25519 plus ML-DSA-65 hostile signature
   matrix.  Six declared vertical vectors [GRACE-VECTORS] cover the
   accepted path and refusals for missing independent outcome signature,
   self-approval, inactive action, replay, and meter-rule smuggling.
   These are same-team reference results, not an independent
   implementation or interoperability claim.

18.  IANA Considerations

   This document has no IANA actions.  The grid.curtailment and EP-
   GRACE-* identifiers are profile-local strings and are not entries in
   an IANA registry.

19.  Normative References

Schrock & Kintzele      Expires 22 February 2027               [Page 10]
Internet-Draft              GRACE Curtailment                August 2026

   [ACTION-STATE]
              Mih, S. W., "An Agent Action Capsule Profile for SCITT",
              Work in Progress, Internet-Draft, draft-mih-scitt-agent-
              action-capsule-02, July 2026,
              <https://datatracker.ietf.org/doc/draft-mih-scitt-agent-
              action-capsule/>.

   [BCP14]    IETF, "Key words for use in RFCs to Indicate Requirement
              Levels", <https://www.rfc-editor.org/info/bcp14>.

   [EP-AEB]   Schrock, I., "Action Evidence Boundary: Binding Verified
              Authorization Evidence to Agent Execution", Work in
              Progress, Internet-Draft, draft-schrock-action-evidence-
              boundary-04, August 2026,
              <https://datatracker.ietf.org/doc/draft-schrock-action-
              evidence-boundary/>.

   [EP-CAID]  Schrock, I., "Canonical Action Identifier: Stable Identity
              for Material Agent Actions", Work in Progress, Internet-
              Draft, draft-schrock-canonical-action-identifier-02,
              August 2026, <https://datatracker.ietf.org/doc/draft-
              schrock-canonical-action-identifier/>.

   [EP-OUTCOME]
              Schrock, I., "Outcome Binding for High-Risk Agent
              Actions", Work in Progress, Internet-Draft, draft-schrock-
              ep-outcome-binding-00, July 2026,
              <https://datatracker.ietf.org/doc/draft-schrock-ep-
              outcome-binding/>.

   [EP-QUORUM]
              Schrock, I., "Multi-Party Quorum Authorization for High-
              Risk Agent Actions", Work in Progress, Internet-Draft,
              draft-schrock-ep-quorum-03, July 2026,
              <https://datatracker.ietf.org/doc/draft-schrock-ep-
              quorum/>.

   [EP-RECEIPTS]
              Schrock, I., "Authorization Receipts for High-Risk Agent
              Actions", Work in Progress, Internet-Draft, draft-schrock-
              ep-authorization-receipts-12, August 2026,
              <https://datatracker.ietf.org/doc/draft-schrock-ep-
              authorization-receipts/>.

   [FIPS204]  National Institute of Standards and Technology, "Module-
              Lattice-Based Digital Signature Standard", FIPS 204,
              August 2024, <https://doi.org/10.6028/NIST.FIPS.204>.

Schrock & Kintzele      Expires 22 February 2027               [Page 11]
Internet-Draft              GRACE Curtailment                August 2026

   [RFC2119]  Bradner, S., "Key words for use in RFCs to Indicate
              Requirement Levels", BCP 14, RFC 2119,
              DOI 10.17487/RFC2119, March 1997,
              <https://www.rfc-editor.org/info/rfc2119>.

   [RFC8174]  Leiba, B., "Ambiguity of Uppercase vs Lowercase in RFC
              2119 Key Words", BCP 14, RFC 8174, DOI 10.17487/RFC8174,
              May 2017, <https://www.rfc-editor.org/info/rfc8174>.

   [RFC8259]  Bray, T., Ed., "The JavaScript Object Notation (JSON) Data
              Interchange Format", STD 90, RFC 8259,
              DOI 10.17487/RFC8259, December 2017,
              <https://www.rfc-editor.org/info/rfc8259>.

   [RFC8785]  Rundgren, A., Jordan, B., and S. Erdtman, "JSON
              Canonicalization Scheme (JCS)", RFC 8785,
              DOI 10.17487/RFC8785, June 2020,
              <https://www.rfc-editor.org/info/rfc8785>.

   [RFC9052]  Schaad, J., "CBOR Object Signing and Encryption (COSE):
              Structures and Process", STD 96, RFC 9052,
              DOI 10.17487/RFC9052, August 2022,
              <https://www.rfc-editor.org/info/rfc9052>.

   [WEBAUTHN] World Wide Web Consortium, "Web Authentication: An API for
              accessing Public Key Credentials - Level 2", April 2021,
              <https://www.w3.org/TR/webauthn-2/>.

20.  Informative References

   [GRACE-IMPLEMENTATION]
              EMILIA Protocol, "GRACE Reference Implementation", 2026,
              <https://github.com/emiliaprotocol/emilia-
              protocol/tree/main/lib/grace>.

   [GRACE-VECTORS]
              EMILIA Protocol, "GRACE Mobile Grid Vertical Composition
              Vectors", 2026, <https://github.com/emiliaprotocol/emilia-
              protocol/blob/main/conformance/vectors/grace-mobile-
              grid.v1.json>.

Authors' Addresses

   Iman Schrock
   EMILIA Protocol, Inc.
   United States of America
   Email: team@emiliaprotocol.ai

Schrock & Kintzele      Expires 22 February 2027               [Page 12]
Internet-Draft              GRACE Curtailment                August 2026

   Justin D Kintzele
   J Diesel NY, LLC
   United States of America
   Email: jkintzele@jdieselny.com

Schrock & Kintzele      Expires 22 February 2027               [Page 13]